ENVIRONMENTAL IMPACT ASSESSMENT STUDIES (EIA) & CLIMATE CHANGE

  1. CLIMATE CHANGE ADAPTATION STUDY FOR ATHENS INTERNATIONAL AIRPORT “EL. VENIZELOS”, 2019.
  2. ΜODIFICATION STUDY FOR THE APPROVED ENVIRONMENTAL TERMS OF THE PROJECT “STUDY – CONSTRUCTION – FUNDING – OPERATION – MAINTENANCE AND EXPLOITATION OF THE NEW INTERNATIONAL AIRPORT OF HERAKLEION, CRETE & STUDY – CONSTRUCTION AND FUNDING OF ROAD CONNECTIONS”, 2017 – 2019.
  3. ENVIROMENTAL ACTION PLAN OF BELGRADE AIRPORT, 2017.
  4. ENVIRONMENTAL IMPACT ASSESSMENT STUDY OF ATHENS METRO LINE 4, ALSOS VEIKOU – GOUDI, 2016-2017.
  5. ENVIRONMENTAL IMPACT ASSESSMENT STUDY OF ATHENS METRO LINE 4, ALSOS VEIKOU – EVAGGELISMOS, 2015.
  6. EIA STUDY OF MOTORIST SERVICE STATION OF MESOGEIA IN ATTIKI ODOS & ENVIRONMENTAL REPORTS OF RENEWAL AND MODIFICATION OF ENVIRONMENTAL TERMS, 2003, 2005, 2009, 2015.
  7. ENVIRONMENTAL IMPACT ASSESSMENT STUDΙΕS OF REGIONAL AIRPORTS GROUP 2: AKTIO PREVEZAS (ΚΑΑΚ), & CHANIA “I. DASKOLOGIANNIS”» (ΚΑΧΝΔ), 2013-2014.
  8. PRELIMINARY DEFINITION OF ENVIRONMENTAL REQUIREMENTS & ENVIRONMENTAL IMPACT ASSESSMENT STUDY (EIA) FOR THE PROJECT: STUDY OF MARONEIA STREET – PETROTA BEACH- LIMITS OF EVROS DISTRICT, 2012-2016.
  9. PRELIMINARY DEFINITION OF ENVIRONMENTAL REQUIREMENTS FOR THE PROJECT: CONNECTION OF N.R. IGOUMENITSA – PREVEZA WITH EGNATIA ODOS (SECTION PARAMYTHIA – MESOPOTAMOS), 2010-2013.
  10. ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR THE EXTENSION OF METRO THESSALONIKIS TO KALAMARIA, 2010-2011.
  11. EIA STUDY FOR THE CENTRAL MEGARON OF ARMY PENSION FUND SURROUNDED BY PANEPISTIMIOU, VOUKOURESTIOU, AMERIKIS & STADIOU STREETS, 2005.
  12. UPDATE OF EIA FOR THE EXTENSIONS OF THE ATHENS METRO, TSA 292, 2005.
  13. PRELIMINARY EIA & EIA OF TRAM TRACK: BASIC NETWORK, EXTENSIONS FROM GLYFADA TO ASKLIPIO VOULAS, (2002 – 2003) & EXTENSION TO PIRAEUS (2005, 2007-2008).
  14. ENVIRONMENTAL REPORT FOR THE EVALUATION OF DIFFERENCES IN THE IMPACTS IN THE ENVIRONMENT FROM THE UPDATE OF ΤΗΕ THESSALONIKI METRO, TSA 294, 2004-2005.
  15. EIA STUDY AND SUPPORT FOR THE ISSUANCE OF ENVIRONMENTAL TERMS FOR THE SECTIONS OF IONIA ODOS MOTORWAY FROM ANTIRRIO TO A/C FANEROMENIS ELEOUSAS, 06/2004-2005.
  16. PRELIMINARY EIA & EIA STUDIES, CATEGORY AI OF THE NEW KASTELI AIRPORT, 2003, 2008.
  17. ENVIRONMENTAL STUDIES FOR THE NEW EXTENSIONS OF ATHENS METRO LINES, 2003-2006.
  18. PRELIMINARY EIA & EIA STUDIES OF THE PROJECT VARIATIONS OF DETECTED SECTIONS OF R.L. THESSALONIKI – ALEXANDROUPOLI, 2003.
  19. STUDY OF RAILWAY CONNECTION OF BI.PE. 2 VOLOS WITH THE NETWORK, COMPLETION AND IMPROVEMENT OF THE CURRENT LINES IN THE NEW SORTING FOR THE COMPOUNDS OF THE STATIONS (PHASE A’) (ENVIRONMENTAL STUDIES), 2003-2014.
  20. ELABORATION OF STUDIES ABOUT THE ENVIRONMENT FOR THE MAIN AXIS OF EGNATIA ODOS AND VERTICAL AXES, 2003-2007.
  21. WATER SUPPLY OF KERKYRAS ISLAND, STUDY FOR DAMS, CENTRAL AQUEDUCT, REFINERIES, DESALINATION UNITS, TENDER DOCUMENTS, LEAKAGE STUDY, ENVIRONMENTAL STUDIES, 2003.
  22. GEOLOGICAL STUDY FROM K.P. 0+000 (LIANOKLADI) TO K.P. 25+000 AND EIA STUDY IN DOUBLE R.L. LIANOKLADI – DOMOKOS (ENVIRONMENTAL STUDIES), 2002-2004.
  23. EIA STUDY, CATEGORY ΑΙ OF INTERNATIONAL AIRPORT OF IKARIA (Κ.Α.ΙΡ), 2001-2003.
  24. EIA STUDIES AND GEOLOGICAL STUDIES FOR THE MANAGEMENT OF EMERGENCIES FROM THE BEGINNING OF ELABORATION, REVISION, ADDITION AND/OR MODIFICATION OF THE STUDY FOR SEVERAL PROJECTS OF THE COMPANY, 1999-2004.
TRAFFIC -TRANSPORTATION FEASIBILITY & EIA STUDY FOR THE MULTI LEVEL INTERSECTION “ALUMINIUM TOWER” AT NICOSIA (CYPRUS)
EIA FOR THE NEW ATHENS METRO LINE 4
EIA FOR THE IGOUMENITSA – PREVEZA NATIONAL ROAD CONNECTION WITH EGNATIA ODOS : PARAMITHIA-MESOPOTAMOS ROAD SECTION
ΝΟx & PM 2,5 μgr/m3 ISO CONCENTRATION CURVES AT THE NEW INTERNATIONAL AIRPORT AT KASTELLI (CRETE) 2018
AIR TEMPERATURE & WIND VECTORS ON THE GROUND AT THE ATHENS INTERNATIONAL AIRPORT (CLIMATIC SCENARIO 2040)