SPECIAL ACOUSTIC STUDIES FOR GROUNDBORNE, AIRBORNE NOISE & VIBRATION

  1. SPECIAL ACOUSTIC STUDY OF GROUNDBORNE NOISE AND VIBRATIONS IN THE FRAMEWORK OF PROJECT CONTRACT CODE 715, CONSTRUCTION OF REMAINING INFRASTRUCTURE PROJECTS, SUPERSTRUCTURE, SIGNALING – TELEADMINISTRATION, TELECOMMUNICATION AND ELECTROMECHANIC INSTALLATIONS OF TUNNELS FOR NEW RAILWAY LINE KIATO – RODODAFNI 2018.
  2. STUDIES & NOISE AND VIBRATION MEASUREMENTS IN THE FRAMEWORK OF SUBCONTRACTING WORKS FOR THE PROJECT ‘STUDY, CONSTRUCTION AND PUT TO OPERATION OF THE THESSALONIKI METRO’, 2016-2020.
  3. NOISE AND VIBRATION STUDIES FOR THE THESSALONIKI METRO – EXTENSION TO KALAMARIA, IN THE FRAMEWORK OF THE PROJECT CON-002/13 “STUDY, CONSTRUCTION AND PUT TO OPERATION OF THE EXTENSION OF THE THESSALONIKI METRO TO KALAMARIA” 2014-2020
  4. MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLAB IN CHANGES 3-02 & 3-03 & AIRBORNE NOISE IN ΤΗΕ SHAFTS, IN THE FRAMEWORK OF ΤΗΕ EXTENSION OF LINE 3 OF ATTIKO METRO TO CHAIDARI, 2014.
  5. MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLABS IN CHANGES 2-55 & 2-56 IN THE FRAMEWORK OF THE EXTENSION OF LINE 2 OF THE ATHENS METRO: AGIOS ANTONIOS – ANTHOUPOLI, 2013.
  6. VIBRATION & NOISE MEASUREMENTS OF GROUNDBORNE AND AIRBORNE NOISE FROM  OPERATION, IN THE FRAMEWORK OF THE EXTENSION OF LINE 3 OF THE METRO, SECTION: AIGALEO – CHAIDARI, TRANSFER STATION CHAIDARI, ELAIONAS DEPOT, 2008.
  7. NOISE AND VIBRATION STUDY & ENVIRONMENTAL PROTECTION STUDY DURING THE CONSTRUCTION OF THE PROJECT “PROVISION, INSTALLMENT AND PUT TO OPERATION OF H/M EQUIPMENT OF INFRASTRUCTURE AND SUPERSTRUCTURE OF THE EXTENSION OF LINES 2 & 3 OF THE ATHENS METRO”, 2002 -2005.
  8. MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLAB IN CHANGE C/O 2-26: KP 15+451-15+486, IN THE FRAMEWORK OF LINE 2 OF THE ATHENS METRO: AG. DIMITRIOS – ELLINIKO, PROJECT: CON – 06/003, 2002.
RECORDING OF VIBRATION VELOCITY AT TUNNEL WALL IN ATHENS METRO (EXTENSION TO ILIOUPOLI) NATM TUNNEL
FLOATING SLAB AT ATHENS METRO NETWORK (ARCHAEOLOGICAL SITE OF KERAMEIKOS
FLOATING SLAB CONCEPTION STUDY AT PIRAEUS EXTENSION OF ATHENS METRO (FEM CALCULATIONS)

RECORDING OF VIBRATION VELOCITY (ppv) & rms WEIGHTED ACCELERATION AT VENIZELOU WORKSITE («HAMTZA MPEI ARCHAEOLOGICAL AREA), AT THESSALONIKI METRO
MULTI-CHANNEL OF REVERBERATION TIME AT MOTORWAY TUNNELS & ATHENS METRO UNDERGROUND STATIONS