TT&E TRAFFIC TRANSPORTATION & ENVIRONMENT CONSULTANTS
Menu
HOME
COMPANY
SERVICES
PROJECTS
ENVIRONMENTAL IMPACT ASSESSMENT STUDIES (EIA) & CLIMATE CHANGE
STRATEGIC ENVIRONMENTAL NOISE MAPPING (DIRECTIVES 2002/49/EC, 2015/996 CNOSSOS-EU)
SPECIAL ACOUSTIC STUDIES FOR GROUNDBORNE, AIRBORNE NOISE & VIBRATION
ENVIRONMENTAL PARAMETERS MONITORING PROGRAMS
ANTI NOISE MITIGATION MEASURES – NOISE BARRIERS STUDIES
TRAFFIC & TRANSPORTATION STUDIES
EUROPEAN PROGRAMS
METROLOGY & SOFTWARE
CLIENTS
LINKS
CONTACT
Ελληνικα
SPECIAL ACOUSTIC STUDIES FOR GROUNDBORNE, AIRBORNE NOISE & VIBRATION
SPECIAL ACOUSTIC STUDY OF GROUNDBORNE NOISE AND VIBRATIONS IN THE FRAMEWORK OF PROJECT CONTRACT CODE 715, CONSTRUCTION OF REMAINING INFRASTRUCTURE PROJECTS, SUPERSTRUCTURE, SIGNALING – TELEADMINISTRATION, TELECOMMUNICATION AND ELECTROMECHANIC INSTALLATIONS OF TUNNELS FOR NEW RAILWAY LINE KIATO – RODODAFNI 2018.
STUDIES & NOISE AND VIBRATION MEASUREMENTS IN THE FRAMEWORK OF SUBCONTRACTING WORKS FOR THE PROJECT ‘STUDY, CONSTRUCTION AND PUT TO OPERATION OF THE THESSALONIKI METRO’, 2016-2020.
NOISE AND VIBRATION STUDIES FOR THE THESSALONIKI METRO – EXTENSION TO KALAMARIA, IN THE FRAMEWORK OF THE PROJECT CON-002/13 “STUDY, CONSTRUCTION AND PUT TO OPERATION OF THE EXTENSION OF THE THESSALONIKI METRO TO KALAMARIA” 2014-2020
MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLAB IN CHANGES 3-02 & 3-03 & AIRBORNE NOISE IN ΤΗΕ SHAFTS, IN THE FRAMEWORK OF ΤΗΕ EXTENSION OF LINE 3 OF ATTIKO METRO TO CHAIDARI, 2014.
MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLABS IN CHANGES 2-55 & 2-56 IN THE FRAMEWORK OF THE EXTENSION OF LINE 2 OF THE ATHENS METRO: AGIOS ANTONIOS – ANTHOUPOLI, 2013.
VIBRATION & NOISE MEASUREMENTS OF GROUNDBORNE AND AIRBORNE NOISE FROM OPERATION, IN THE FRAMEWORK OF THE EXTENSION OF LINE 3 OF THE METRO, SECTION: AIGALEO – CHAIDARI, TRANSFER STATION CHAIDARI, ELAIONAS DEPOT, 2008.
NOISE AND VIBRATION STUDY & ENVIRONMENTAL PROTECTION STUDY DURING THE CONSTRUCTION OF THE PROJECT “PROVISION, INSTALLMENT AND PUT TO OPERATION OF H/M EQUIPMENT OF INFRASTRUCTURE AND SUPERSTRUCTURE OF THE EXTENSION OF LINES 2 & 3 OF THE ATHENS METRO”, 2002 -2005.
MEASUREMENTS FOR THE EFFECTIVENESS OF THE FLOAT SLAB IN CHANGE C/O 2-26: KP 15+451-15+486, IN THE FRAMEWORK OF LINE 2 OF THE ATHENS METRO: AG. DIMITRIOS – ELLINIKO, PROJECT: CON – 06/003, 2002.
RECORDING OF VIBRATION VELOCITY AT TUNNEL WALL IN ATHENS METRO (EXTENSION TO ILIOUPOLI) NATM TUNNEL
FLOATING SLAB AT ATHENS METRO NETWORK (ARCHAEOLOGICAL SITE OF KERAMEIKOS
FLOATING SLAB CONCEPTION STUDY AT PIRAEUS EXTENSION OF ATHENS METRO (FEM CALCULATIONS)
RECORDING OF VIBRATION VELOCITY (ppv) & rms WEIGHTED ACCELERATION AT VENIZELOU WORKSITE («HAMTZA MPEI ARCHAEOLOGICAL AREA), AT THESSALONIKI METRO
MULTI-CHANNEL OF REVERBERATION TIME AT MOTORWAY TUNNELS & ATHENS METRO UNDERGROUND STATIONS
Search
DOWNLOAD BROCHURE
Follow
Following
TT&E TRAFFIC TRANSPORTATION & ENVIRONMENT CONSULTANTS
Sign me up
Already have a WordPress.com account?
Log in now.
TT&E TRAFFIC TRANSPORTATION & ENVIRONMENT CONSULTANTS
Customize
Follow
Following
Sign up
Log in
Copy shortlink
Report this content
View post in Reader
Manage subscriptions
Collapse this bar